Completed work, start to finish.
Based in Mableton, proudly serving Austell and Metro Atlanta.
Browse finished showers by style, then see how each one comes together, from open walls to the final tile.
Prefer to talk? Call (404) 947-3737
Before and after
The same space at an early stage and when it was finished.
Window shower
Half-wall shower
Shower pan
How a shower is built
The work behind the tile, step by step. This is the part you can't see once the shower is finished.
-
Open the walls
The old tile and wall materials come out down to the studs, so we can see what is really behind them.
-
Rough-in plumbing
Valve and drain plumbing is set and measured before anything closes up.
-
Cement board and mortar bed
Cement backer board goes up, and the shower floor is built from mortar sloped toward the drain.
-
Waterproofing
A waterproof membrane covers the walls, niche and floor, including every seam and corner.
-
Tile and finish
Tile goes on over the membrane, then grout, trim and fixtures finish the job.
Most shower builds run 2–3 weeks once work begins.